
Paul Rafalides
School
Paul Rafalides School (PS #33) is a 3-story, 30,607 square foot building built in 1909. Spaces include classrooms, a library, cafeteria, corridors, stairwells, offices, a kitchen, and mechanical spaces.

Energy Conservation Measures
Below is a brief description of each of the 9 ECMs

LED Lighting Replacement
Replace existing lighting with new LED Lighting

District-Wide Energy Management System
Replace existing pneumatic controls with new open-protocol controls

Roof Renovations
Plug Load Controls
Renovate older roofing and realize new 15 year warranty

Solar PPA
Generate electricity on site for cost savings

Building Envelope
Improve comfort and reduce infiltration

Water Conservation
Pipe Insulation
Improve existing pipe insulation to prevent heat loss and save energy

Student Education Program
Involve students and the community in the district energy project