Rafael Cordero Y Molina School
Rafael De J. Cordero Elementary School is a five-story, 135,534 square foot building built in 1922. Spaces include classrooms, offices, gymnasium, locker rooms, auditorium, cafeteria, kitchen, corridors, stairwells, restrooms, storage rooms, and basement mechanical space. Lighting is provided mainly by T8 equivalent LED lamps. The facility has two steam boilers that provide heating to spaces. There is one passenger elevator in the building.

Energy Conservation Measures
Below is a brief description of each of the 8 ECMs

LED Lighting Replacement
Replace existing lighting with new LED Lighting

Boiler Replacement
Replace old boilers with new, high-efficiency boilers

Building Envelope
Water Conservation
Improve comfort and reduce infiltration
Plug Load Controls

Pipe Insulation
Improve existing pipe insulation to prevent heat loss and save energy

Destratification Fans
Student Education Program
Involve students and the community in the district energy project