
A. Harry Moore School
A. Harry Moore School is a 5-story 63,500 square foot building located in Greenville as an extension of Academy 1 Middle School. The school was opened in 1931 and offers comprehensive academic, therapeutic, pre-vocational and social programs to students who are classified as Preschool Disabled, Learning and Language Disabled, and Multiply Disabled. Spaces include classrooms, auditorium, offices, dining area, corridors, stairwells, kitchen, restrooms, electrical rooms, and mechanical spaces.

Energy Conservation Measures
Below is a brief description of each of the 8 ECMs

LED Lighting Replacement
Replace existing lighting with new LED Lighting

District-Wide Energy Management System
Replace existing pneumatic controls with new open-protocol controls

Water Conservation
Pipe Insulation
Improve existing pipe insulation to prevent heat loss and save energy

Building Envelope
Improve comfort and reduce infiltration

Retro-Commissioning Study
Review and address older systems that are too expensive to replace

Steam Trap Replacement
Student Education Program
Involve students and the community in the district energy project

Premium Efficiency Pump Motors & VFDs
Replace old motors with new, high-efficiency motors w/ VFDs

Install VFDs on Heating/Chilled Water Pumps
Reduce pump motors speeds to save energy

Install VFDs on Process Pumps
Pipe Insulation
Reduce pump motor speeds to save energy

Install VFDs on Kitchen Hood Fan Motors
Reduce fan speeds to save energy

Install High Efficiency Air Conditioning Units
Generate electricity on site for cost savings

Install High Efficiency Gas-Fired Water Heater
Generate hot water on site more efficiently

Refrigerator/Freezer Case Electrically Commutated Motors
ECM Motors make refrigerators/freezers more efficient

Install Low Flow DHW Devices
Conserve water consumption

Refrigeration Controls
Operate refrigeration systems more efficiently

Food Service Equipment Replacement
Replace old cooking equipment with new, high efficiency equipment

Replace Refrigeration Equipment
Replace old refrigeration equipment with new, high efficiency equipment

Vending Machine Control
Operate vending machines more efficiently

Install High Efficiency Furnaces
Replace old furnaces with new, high efficiency furnaces

Heat Pump Replacement
Replace old heat pumps with new, high efficiency heat pumps

Automatic Pool Cover
Reduce water and heat loss in pools with automatic covers

Indoor Air Quality and Bi-Polar Ionization Cleaners
Improve the learning environment and air quality

Install Heat Pump Water Heater
Replace old hot water generating equipment with new, high efficiency heat pump water heaters

Implement Demand Control Ventilation
Ventilate buildings based on CO2 levels

Arris Wind & Solar Lighting
Solar powered outdoor lighting
Retro-Commissioning Study
Review and address older systems that are too expensive to replace

Add Ventilation & HVAC
Address schools that do not currently have classroom ventilation systems

Unit Ventilator Replacement
Replace old classroom HVAC units with new, higher efficiency units

Combined Heat & Power
Generate electricity on site with natural gas fired generators