
Mahatma K. Ghandi
School
Mahatma Gandhi ES (PS #23) is a 3-story, 164,653 square foot building built in 1922. Spaces include classrooms, a gymnasium, a natatorium, an auditorium, offices, a cafeteria, corridors, stairwells, a kitchen, and mechanical spaces.

Energy Conservation Measures
Below is a brief description of each of the 10 ECMs

LED Lighting Replacement
Replace existing lighting with new LED Lighting

District-Wide Energy Management System
Replace existing pneumatic controls with new open-protocol controls

Plug Load Controls
Building Envelope
Improve comfort and reduce infiltration

Solar PPA
Generate electricity on site for cost savings

Refrigeration Controls
Operate refrigeration systems more efficiently

Pipe Insulation
Improve existing pipe insulation to prevent heat loss and save energy

Retro-Commissioning Study
Review and address older systems that are too expensive to replace
Steam Trap Replacement

Student Education Program
Involve students and the community in the district energy project